Client
Ministry of Transport
Construction Cost
150 million SAR
Services Performed
- Preliminary & Final Design
- Tender Documents
Project Components
- 5km of 3-lane dual carriageway
- 1 new interchanges.
- 1 at-grade intersection.
Description
The project scope include preliminary and final design of 5 km 3-lane dual carriageway and cloverleaf type interchange tying Arar / Dimisah / Jordan primary road to Turaif / Qurayat road, the design includes at-grade intersection and the detailed design of the interchange bridge. The scope include also the detail design of storm drainage and flood protection works.