Client

Ministry of Transport

Construction Cost

150 million SAR

Services Performed

  • Preliminary & Final Design
  • Tender Documents

Project Components

  • 5km of 3-lane dual carriageway
  • 1 new interchanges.
  • 1 at-grade intersection.

Description

The project scope include preliminary and final design of 5 km 3-lane dual carriageway and cloverleaf type interchange tying Arar / Dimisah / Jordan primary road to Turaif / Qurayat road, the design includes at-grade intersection and the detailed design of the interchange bridge. The scope include also the detail design of storm drainage and flood protection works.