Client
General Directorate of Highways
Services Provided
Technical Support of:
- Preliminary & Final Design of Landscape.
- Environmental Studies.
- Tender Documents.
- Technical Support during Construction.
Project Components
- 74km of 3-lane dual carriageway
- 7 interchanges.
- 49 bridges.
Description
Fast-track design, hydrological surveys, environmental impact studies including public health , air and water quality, as well as pollution mitigation, in addition to the design of hardscape, soft escape, irrigation schemes, aesthetic lighting and construction documents for 74 km of motorway and link roads, with 7 grade-separated interchanges, 49 bridges (including 3 railway bridges), 154 box-culverts and 3 toll plazas.