Client

Ministry of Transport Construction Cost

2,060 million SAR

Services Performed          Alignment Selection Studies,

  • Feasibility & Traffic study.
  • Preliminary & Final Design studies,
  • Preparing of Tender Documents.

Project Components

  • 500 km of road in different categories,
  • 2 grade seperated interchange,
  • 40 at-grade intersection,
  • 2 crossing bridges and 3 wadi bridges.

Description

The project scope include Corridor & alignment selection, preliminary & final design studies, and the preparation of tender documents for the 500 km of single and dual carriageways with a design speed of 100km/hr. The project components having different lengths which are scattered within Riyadh province and serving as primary & secondary road network elements in Riyadh. Each component having different geometrical standard, been designed as a dual carriageway with relevant service standards.