Ortaköy – Gölcük Motorway / TURKEY

Client

General Directorate of Highways

Services Provided

Technical Support of:

  • Preliminary & Final Design of Landscape.
  • Environmental Studies.
  • Tender Documents.

Project Components

  • 94km of 3-lane dual carriageway
  • 3 interchanges.
  • 6km 2-lane access links.

Description

Environmental impact studies including public health, air and water quality, as well as pollution mitigation, in addition to the design of hardscape, soft escape, irrigation schemes and aesthetic lighting of 93.76 km dual 3-lane motorway and a 6 km dual 2-lane connection road, including 3 motorway interchanges, 1 connection road interchange, 2 at-grade junctions, 31 small structures (dimensions up to 10 m x 5 m), 2 parking areas, 1 TIR area, and 3 toll areas. Services covered preparation of related geodetical works and 1/1.000 mapping, soil investigations, hydraulic and hydrologic calculations, 1/1.000 drainage designs, traffic marking and signing, guardrail fence designs, landscape design, geotechnical reports, bills of quantities, earthworks quantities, mass and haul diagram, and schedules for expropriation plans.