Client

Ministry of Transport

Construction Cost

1,900 million SAR

Services Provided

Technical Support of:

  • Alignment Selection
  • Preliminary & Final Design
  • Tender Documents

Project Components

  • 70 km of 4-lane dual carriageway
  • 8 new interchanges.
  • 4 crossing bridges.
  • 2 wadi bridges

Description

The scope of the project includes alignment selection, preliminary and final designs, in addition to the preparation of the tender documents for entire length of the road with about 70 km 4-lane dual carriageway and 9 grade separated interchanges. This comprises 12 road crossing bridges; 9 wadi bridges, 2 vehicular crossing; and 3 camel crossings. This also include the detailed design of the required drainage works and flood protection measures to protect the road alignment against flash floods. The scope of work include also landscaping and irrigation network, street lighting, and road safety features.