Client:

Ministry of Transport / KSA, 2012

 

Construction Cost

735 million SAR

Services Performed

  •   Feasibility & Preliminary Studies

Main Project Components

  • 28 km of improvement Thumamah Road,
  • 5 grade separation intersection.

Description

Being one of the major components of Riyadh city network, Improvement and widening of Thomamah Road, the project scope includes the alignment studies for the main road crossings and the preliminary / final design studies besides the preparation of tender documents. The main expressway comprises of 28 km with 3 lane dual carriageway and a design speed of 100km/hr together with 2-lanes service road and 5 grade separated interchanges serving the nearby settlements