Client

Ministry of Transport

Construction Cost

560 million SAR

Services Provided

Technical Support of:

  • Feasibility & Traffic study,
  • Alignment Selection,
  • Preliminary & Final Design,
  • Tender Documents.

Project Components

  • 30 km of 4-lane dual carriageway
  • 25 km service roads
  • 5 new interchanges.
  • 12 crossing bridges.
  • 2 railway crossings

Description

The project scope of work include alignment selection, preliminary and final designs, and preparation of tender documents for an 40 km 4-lane dual carriageway comprising 6 grade separated interchanges and 12 crossing bridges. The scope also comprises the detailed design of the required drainage works and flood protection measures to protect the project area against flash floods. It also include landscaping and irrigation, street lighting, and road safety features.