Client

Ministry of Transport

Construction Cost

9.050 Billion SAR

Services Provided

Technical Support of:

  • Feasibility & Traffic study,
  • Aligment Selection,
  • Preliminary and Final   Design Design,
  • Preparation of Tender Documents.

Project Components

  • 85 km  5-lane dual carriageway, M.R.R
  • 13 grade seperated interchanges, M.R.R.
  • 103 km 5-lane dual carriageway, 2.R.R
  • 18 grade seperated interchanges, 2.R.R

Description

This is one of the major components of Jeddah road network and connecting North and South Jeddah city. The project scope includes feasibility and traffic study in addition to project module and the preliminary / final design studies & preparation of the project tender documents.The M.R.R comprises of 85 km. / (5) lane dual carriageway and the (13) interchange.The 2.R.R comprises of 103 km. / (5) lane dual carriageway and the (18) interchange. This also comprises the detailed design of the required drainage works and flood protection measures to protect the road alignment against regional flash floods.