Client
Ministry of Transport
Construction Cost
17 million SAR
Services Performed
- Preliminary and Final Design.
Project Components
- 2 Interchanges
- 4 utility crossings
- 1 Wadi Bridge.
Description
This include the Geometry and Structural Preliminary and Final Design of the facilities along Arar Bypass including two interchanges, Arar wadi bridge and 4 utilities crossings with total area of 19,000 m2 of structures.