Client

Ministry of Transport

Construction Cost

17 million SAR

Services Performed

  • Preliminary and Final Design.

Project Components

  • 2 Interchanges
  • 4 utility crossings
  • 1 Wadi Bridge.

Description

 

This include the Geometry and Structural Preliminary and Final Design of the facilities along Arar Bypass including two interchanges, Arar wadi bridge and 4 utilities crossings with total area of 19,000 m2 of structures.