Client
Ministry of Transport
Construction Cost
7 million SAR
Services Performed
- Alignment Selection Studies.
- Preliminary & Final Design.
- Preparing of Tender Documents.
Project Components
- 3 km of service roads.
- 2 grade seperated U turn Bridges,
Description
The project is located at the intersection of the eastern ring road with Abdullah bin Rashid Road. The project aims to study and design solutions for the development of exit 12 and increase its absorption of cars and upgrading the service level and reduce the bottlenecks resulting from multiple movements at each intersection.