Client

Ministry of Transport / KSA, 2012

 

Construction Cost 

     553 million SAR

Services Provided

  • Technical Support
  •  Dualization of  an existing road
  •  Preliminary & Final Design studies,
  •  Preparing of Tender Documents.

Main Project Components

  • 183 km of Dualization of Qwiaya- Rain – Hariq
  • 1 grade separation intersection,
  • 3 at-grade intersection.

Description

Dualization and widening of existing road, preparation of tender documents for the 183 km dual carriageways with a design speed of 100km/hr. The project is serving as primary road in Riyadh Province, tying Riyadh – Makah Road  at Qwiaya to Riyadh  –  Al Karg  road at Al Hariq.