Client

       Ministry of Transport

Construction Cost

98 million SAR

Services Performed

  • Dualization of existing road
  • Preliminary & Final Design studies
  • Preparing of Tender Documents.

Project Components

  • 47 km of Dualization of Mirat – Sajer Road
  • 1 at-grade intersection type C.

Description

The project comprises Dualization and widening of existing road and preparation of the tender documents for the 47 km dual carriageways with a design speed of 100km/hr. The road alignment is serving as a secondary road elements within Riyadh Province. The scope include also the detail design of storm drainage and flood protection works to protect road alignment.