Client
Ministry of Transport
Construction Cost
98 million SAR
Services Performed
- Dualization of existing road
- Preliminary & Final Design studies
- Preparing of Tender Documents.
Project Components
- 47 km of Dualization of Mirat – Sajer Road
- 1 at-grade intersection type C.
Description
The project comprises Dualization and widening of existing road and preparation of the tender documents for the 47 km dual carriageways with a design speed of 100km/hr. The road alignment is serving as a secondary road elements within Riyadh Province. The scope include also the detail design of storm drainage and flood protection works to protect road alignment.