Client

Ministry of Transport

Construction Cost

95 million SAR

Services Performed

  • Preliminary & Final Design
  • Structural detailed design    production of shop drawings

Project Components

  • 1 Interchange
  • 1 wadi bridge.

Description

This include the Geometrical and Structural design Final Design of the directional interchange and wadi bridge along the road with total length of 5km of 2-lane ramps and an area of about 13,000 m2 of bridges structures.