Client
Ministry of Transport
Construction Cost
95 million SAR
Services Performed
- Preliminary & Final Design
- Structural detailed design production of shop drawings
Project Components
- 1 Interchange
- 1 wadi bridge.
Description
This include the Geometrical and Structural design Final Design of the directional interchange and wadi bridge along the road with total length of 5km of 2-lane ramps and an area of about 13,000 m2 of bridges structures.