Client

Ministry of Transport / KSA, 2012

 

Construction Cost

340 million SAR

Services Provided

Technical Support of:

  • Preliminary & Final Design studies,
  • Preparing of Tender Documents.

Main Project Components

  • 28 km of improvement Alderaiya       Road,
  • 2 grade separation intersection.
  • 3 long Viaducts Crossing

Wadi Hanifa tributaries

  • 1 Underpass

Description

The project scope includes the alignment studies for the main road crossings and the preliminary / final design studies besides the preparation of tender documents. The main expressway comprises of 18 km with 3 lane dual carriageway (design speed of 120km/hr), 2 Lanes service road, 1 grade separated I/C and 2 at grade intersection serving the nearby settlements  together with 3 long viaducts crossing major deep vallies as Hanifa and Hariqua vallies