Client

Ministry of Transport Construction Cost

70 million SAR

Services Performed        

  • Corridor / Alignment Selection Studies,
  • Preliminary & Final Design Studies,
  • Preparing of Tender

Documents.

Main Project Components

  • 65 km. state road,
  • 1 wadi bridge,
  • 3 at-grade intersections,
  • Relevant minor hydraulic structures.

Description

Alignment selection, preliminary & final design studies, preparation of tender documents for the 53km 1 lane dual carriageways with a design speed of 80km/hr. İncluding 6 at grade I/C.’s and 9 km. of 1 lane dual carriageways being one of the major components of the project.