Client
Ministry of Transport
Construction Cost
68 million SAR
Services Performed
- Alignment Selection Studies,
- Preliminary & Final Design studies,
- Preparing of Tender Documents.
Project Components
- 60 km of level B service road
- 2 at-grade intersection,
Description
The scope of the project includes corridor & alignment selection, preliminary & final design studies, preparation of tender documents for the 60 km single carriageways (tiypcal 2 lanes road) with a design speed of 80km/hr. The scope include also the detail design of storm drainage and flood protection works to protect road alignment.