Client

     Ministry of Transport

Construction Cost

54 million SAR

Services Performed

  • Alignment Selection Studies,
  • Preliminary & Final Design studies,
  • Preparing of Tender Documents.

Project Components

  • 50 km of level B service road
  • 3 at-grade intersection,
  • 1 Roundabout

Description

The scope of the project includes corridor & alignment selection, preliminary & final design studies, preparation of tender documents for the 50 km single carriageways (2*3.65 lane width and 2.5 shoulder width) with a design speed of 80km/hr. The project components having different lengths are scattered in the project area serving as secondary road network elements in Riyadh Province.