Client
Ministry of Transport
Construction Cost
54 million SAR
Services Performed
- Alignment Selection Studies,
- Preliminary & Final Design studies,
- Preparing of Tender Documents.
Project Components
- 50 km of level B service road
- 3 at-grade intersection,
- 1 Roundabout
Description
The scope of the project includes corridor & alignment selection, preliminary & final design studies, preparation of tender documents for the 50 km single carriageways (2*3.65 lane width and 2.5 shoulder width) with a design speed of 80km/hr. The project components having different lengths are scattered in the project area serving as secondary road network elements in Riyadh Province.