Client

Ministry of Transport / KSA, 2012

Construction Cost

   41 million SAR

Services Performed

  • Alignment Selection Studies,
  •  Preliminary & Final Design studies,
  •  Preparing of Tender Documents.

Main Project Components

  • 36 km of road secondary road
  • 2 at-grade intersection,

Description

Corridor & alignment selection, preliminary & final design studies, preparation of tender documents for the 36 km single carriageways (2×3.65 lane width and 2.5m shoulder width) with a design speed of 80km/hr. The project components having different lengths are scattered in the project are serving as secondary road network elements in Asir Province.