Client
Ministry of Transport / KSA, 2012
Construction Cost
41 million SAR
Services Performed
- Alignment Selection Studies,
- Preliminary & Final Design studies,
- Preparing of Tender Documents.
Main Project Components
- 36 km of road secondary road
- 2 at-grade intersection,
Description
Corridor & alignment selection, preliminary & final design studies, preparation of tender documents for the 36 km single carriageways (2×3.65 lane width and 2.5m shoulder width) with a design speed of 80km/hr. The project components having different lengths are scattered in the project are serving as secondary road network elements in Asir Province.