Client
Greater Aydın Municipalit
Construction Cost
41,000,000 $
Services Provided
Technical Support of:
- Alignment/Geometrical/Geotechnical/Drainage studies,
- Structural Design studies,
- Preliminary and Final Design studies,
- Preparation of BOQ and Tender Documents.
Project Components
- 4 km., 2-lane dual carriageway
- 2 round-about interchanges,
- 2 underpasses/retaining walls,
Description
The project is one of the major component of the Kusadası Ring road system, connecting the touristic destinations in east-west direction. The project scope includes the alignment studies for the Municipal road and the preliminary / final design studies in addition to the preparation of the project tender documents. The main road comprises of 2.4 km.s / 2 lane dual carriageway and 2round-about Interchanges, also serving the nearby settlements with service roads. Studies also comprises the mapping, detailed design of the geological and geotechnical studies besides the drainage